厦门厨房设备-厦门厨具批发-厦门食堂厨具-厦门市佳瑞美厨房设备公司

News Center

Location: Home >News Center

News Center

Recommend

Contact Us

Jiangsu Xinhantong Intelligent Electrical Technology Co., Ltd

Tel: 0511-80303080

Fax: 0511-80303081

Address: No.1 Chaoyang North Road, Chengbei Science and Technology Industrial Park, Sanmao Street, Yangzhong City

Bridge construction matters

2023-10-09
692次

1、 Construction

Measurement and positioning → Support and hanger manufacturing device → Bridge device → Grounding treatment

2、 Construction methods and skill methods

(1) Measurement and positioning: Use the line snapping method to mark the equipment position of the bridge, determine the fixed position of the bracket, and mark it correctly. Composite cable tray is the second generation product in the cable tray series and a new type of cable tray. It is suitable for laying various projects, units, and cables. It has the characteristics of simple structure, flexible configuration, convenient installation, and novel form. The positioning of the bridge in the vertical shaft should first use the suspension line method to determine the device reference line. If the reserved hole is not suitable, it should be adjusted and repaired in real time.

(2) Bracket manufacturing device

(3) According to the construction drawing design elevation and bridge specifications, locate and manufacture the bracket based on the measured dimensions. These brackets are produced in the factory. All components of the cable tray need to be galvanized and installed on the outdoor tray outside the building. The full name of a rigid structural system, including straight sections, elbows, tees, groove types, tray or stepped cross sections, as well as support arms, hangers, etc., which have tightly connected support cables. Slot type cable tray, also known as slot type cable tray, is a fully enclosed cable tray suitable for laying computer cables, communication cables, thermocouple cables, and other control cables for high sensitivity systems. It has good effects on shielding control cables from interference and protecting cables in highly corrosive environments. There is no ceiling beam bottom lifting or wall support device, but there is a ceiling internal lifting or wall support device. In public places without suspended ceiling, connect structural members, and take into account the beauty and convenience of construction and maintenance, use wall or column support devices or install them on the bottom chord members of Truss roof. The bracket of the wall mounted device is fixed with expansion bolts, and the spacing between the brackets does not exceed 2 meters. Supports and hangers should be added at the intersection of straight and non straight sections, at the deformation joints of buildings, and in the middle of non straight sections with a bending radius greater than 300mm. The support and hanger device should ensure that the degree or verticality of the bridge meets the requirements.

(4) Bridging device

① Regarding the extraordinary appearance of the bridge, the dimensions measured on-site will be handed over to the means supplier, who will manufacture based on the dimensions and reduce on-site processing. The material, model, thickness, and accessories of the bridge meet the design requirements.

② Before installing the bridge, it is necessary to coordinate with various specialties to prevent conflicts between large diameter fire pipes, sprinkler pipes, hot and cold water pipes, drainage pipes, as well as air conditioning and exhaust equipment.

③ Lift the bridge to the predetermined position and secure it to the bracket with bolts. Carefully check the dimensions at the turn. The slope of this bridge should be the same as the slope of the building. For bridges on curved building walls, the curved shape should be consistent with the building. The bridge is connected to the bridge through a connecting plate, and the connecting bolt is a half round head bolt, which is located on the inner side of the bridge. The cracks between cable trays must meet the design requirements to ensure that the cable trays of the system are integrated.

④ Bridges crossing deformation joints in buildings should be treated as expansion joints in accordance with the enterprise standard "Special Steel Cable Tray Installation Technology". When the straight section of the steel bridge exceeds 30m, a thermal expansion compensation device should be installed.

⑤ The bridge device is horizontal and vertical, with a uniform and beautiful appearance


contact us

Jiangsu Xinhantong Intelligent Electrical Technology Co., Ltd

Tel: 0511-80303080

Fax: 0511-80303081

Address: No.1 Chaoyang North Road, Chengbei Science and Technology Industrial Park, Sanmao Street, Yangzhong City

主站蜘蛛池模板: 久久手机视频 | 在线精品国产三级 | 老熟妇性老熟妇性色 | 嫩草亚洲国产精品 | 久久国产视频在线观看 | 国产精品一区二区 尿失禁 国产精品一区二区av | 亚洲 小说区 图片区 都市 | 无码国产成人午夜电影在线观看 | 四虎在线最新地址公告 | 国产黄色在线看 | 色妞ww精品视频7777 | 欧美a级黑粗大硬长爽 | 精品欧美一区二区三区在线 | va亚洲va欧美va国产综合 | 免费黄色大片视频 | 亚洲国产精品无码一线岛国 | 被灌满精子的波多野结衣 | 国产两女互慰高潮视频在线观看 | 成人精品一区二区不卡视频 | 国产精品成人久久久 | 亚洲国产高清美女在线观看 | 狠狠狠色丁香婷婷综合久久俺 | 亚洲真人无码永久在线 | 久久免费视频一区 | 中文字幕精品无码一区二区 | 久久夜色精品国产噜噜亚洲sv | 欧美一区二区三区大片 | 欧美真人作爱免费视频 | 一级成人毛片免费观看欧美 | 少妇高潮惨叫久久久久电影69 | 午夜伦伦| 久草在线观看首页 | 久久久久久人妻无码 | 日本不卡一区二区三区 | 国产精品嫩草视频永久网址 | 国产综合久久久久久鬼色 | 久久国产视频网 | 成人午夜免费福利视频 | 日日av | 老鸭窝在线观看视频 | 亚洲av午夜福利精品一区二区 |